1. <tt id="5hhch"><source id="5hhch"></source></tt>
    1. <xmp id="5hhch"></xmp>

  2. <xmp id="5hhch"><rt id="5hhch"></rt></xmp>

    <rp id="5hhch"></rp>
        <dfn id="5hhch"></dfn>

      1. 工作英語:工作流程的英語

        時間:2022-07-14 09:37:07 Offer 我要投稿
        • 相關(guān)推薦

        工作英語:工作流程的英語

          On target/on schedule
          Means that a project, task, or assignment is proceeding according to pre-determined timelines.
          按預(yù)定目標(biāo)或按預(yù)定日程
          一項(xiàng)工程、工作或任務(wù)按照預(yù)先定好的日程表來實(shí)施。
          Completion status
          The amount of measurable work that has been done for a specific project or task. Usually expressed as a percentage.
          完工狀況
          就一個具體項(xiàng)目或一項(xiàng)具體任務(wù)而言,已經(jīng)做完的、可衡量的工程量或任務(wù)量,通常用百分率表示。
          Milestones
          Key chronological points that denote/chart important events along the evolution of a project.
          里程碑
          項(xiàng)目實(shí)施過程中的標(biāo)志重要標(biāo)志性事件。
          Delivery date
          Date when an assignment is expected to be completed.
          交付日期
          預(yù)期完成任務(wù)的時間。
          Drop-dead date (Deadline)
          Date beyond which there is absolutely no room for further delay in deliverables.
          最后期限
          絕對不能再推遲的交付時間。
          Critical points
          Points along the evolution of a project that must be completed and delivered before any other project action can proceed.
          關(guān)鍵點(diǎn),重要事情
          在工程的發(fā)展中趕在其他項(xiàng)目進(jìn)行之前,必須完成和交付的事情。
          Inductive reasoning
          Inductive reasoning moves from specific details to broader generalizations.Informally, we sometimes call this a "bottom up"approach. Inductive reasoning begins with specific observations and measures of detailed tasks and assignments, which are then categorized and classified into functional activities (e.g. Sales, Marketing) to form general plans and strategies.
          歸納推理
          歸納推理是從具體中歸納普遍的規(guī)律。通俗地說,我們有時稱之為“自上而下”的方法。歸納推理始于對詳細(xì)工作及任務(wù)的具體觀察和衡量,然后將之分類成各種功能性的活動(例如:銷 售、市場行銷)從而形成總的規(guī)劃和策略。
          Deductive reasoning
          Deductive reasoning works from the more general to the more specific. Sometimes this is informally called a "top-down" approach.
          演繹推理
          演繹推理從一般到具體,有時被稱為“自上而下”的方法。
          Flowcharting
          Flowcharting is one method of pictorially representing a procedural (step-by-step) solution to a business problem before you actually start to write the action plan.
          流程圖
          流程圖是一種在你真正開始寫計劃前對于商務(wù)問題解決方法的一種步驟構(gòu)想。
          MBO
          Management By Objectives. A methodology that creates quantifiable and measurable expected results at all functional levels in a project.
          目標(biāo)管理
          目標(biāo)管理——在項(xiàng)目中,無論任何職能下均可獲得量化的和可衡量的預(yù)期結(jié)果的一種方法。

        工作英語:工作流程的英語

        【工作英語:工作流程的英語】相關(guān)文章:

        工作流程的英語08-08

        英語辯論賽流程12-08

        班級英語辯論賽流程07-25

        2017職稱英語報名流程06-06

        英語辯論賽流程(精選8篇)03-08

        2017小升初英語面試流程06-15

        大學(xué)英語六級考試的流程06-05

        大學(xué)英語六級考試流程06-06

        英語工作報告08-01

        英語工作總結(jié)06-29

        国产高潮无套免费视频_久久九九兔免费精品6_99精品热6080YY久久_国产91久久久久久无码

        1. <tt id="5hhch"><source id="5hhch"></source></tt>
          1. <xmp id="5hhch"></xmp>

        2. <xmp id="5hhch"><rt id="5hhch"></rt></xmp>

          <rp id="5hhch"></rp>
              <dfn id="5hhch"></dfn>