1. <tt id="5hhch"><source id="5hhch"></source></tt>
    1. <xmp id="5hhch"></xmp>

  2. <xmp id="5hhch"><rt id="5hhch"></rt></xmp>

    <rp id="5hhch"></rp>
        <dfn id="5hhch"></dfn>

      1. 國際商務單證員考試審證模擬試題及答案

        時間:2024-07-28 02:54:40 國際商務單證員 我要投稿

        2017國際商務單證員考試審證模擬試題及答案

          1.買賣雙方簽署的合同

        2017國際商務單證員考試審證模擬試題及答案


           浙江永康劍鼓手工具進出口有限公司

        ZHEJIANG YK GG HAND TOOL I/E CO., LTD.

        296 HUAYANG ROAD, YONGKANG CITY ZHEJIANG, CHINA

        銷售確認書

        SALES CONFIRMATION

        To:

        SAYID TOOL ENTERPRISES

        S/C No.:

        YKGG120609

        753 TARRAGONA ROAD

        Date:

        09 JUNE 2012

        DURBAN SOUTH AFRICA

        Place:

        YONGKANG, CHINA

         

        Dear Sirs:

        We hereby confirm having sold to you the following goods on terms and conditions as specified below:

        Description of Goods and Packing

        Quantity

        Unit Price

        Total Amount

        HAND TOOLS

         

         

        CIFC5 DURBAN

        10PCS COMBINATION SPANNER

        1200SETS

        USD11.00

        USD13200.00

        12PCS DOUBLE OFFSET RING SPANNER

        1000SETS

        USD12.50

        USD12500.00

         

        2200SETS

         

        USD25700.00

         

        LESS 5%COMM.

        USD1285.00

        PACKING: IN ONE CARTON OF 20 SETS EACH, TOTAL IN

        CIF

        USD24415.00

        1*20 FCL.

         

         

        Total Amount in words:

        SAY U. S. DOLLARS TWENTY FOUR THOUSAND FOUR HUNDRED AND

         

        FIFTEEN ONLY.

        Port of loading:

        NINGBO / SHANGHAI

        Port of discharge:

        DURBAN, SOUTH AFRICA

        Time of Shipment:

        ON OR BEFORE 16 JULY 2012

        Partial:

        NOT ALLOWED

        Transshipment:

        ALLOWED

        Insurance:

        TO BE EFFECTED BY THE SELLER FOR 110 PCT OF THE INVOICE VALUE

         

        COVERING ALL RISKS AND WAR RISK AS PER ICC(A) DATED 01/01/2009

        Terms of Payment:

        BY CONFIRMED AND IRREVOCABLE LETTER OF CREDIT IN FAVOUR OF

         

        THE SELLER TO BE AVAILABLE BY SIGHT DRAFTS AND TO BE OPENED

         

        AND REACH CHINA ON OR BEFORE 13 JUN. 2012REMAINING VALID FOR

         

        NEGOTIATION IN CHINA UNTIL THE 15TH DAYS AFTER THE TIME OF

         

        SHIPMENT

        Inspection:

        INSPECTED BY CIQ

        Shipping Marks:

        AS PER SELLER’S OPTION

        Documents required:

        MANUALLY SIGNED COMMERCIAL INVOICE IN TRIPLICATE

         

        FULL SET CLEAN ON BOARD BILL OF LADING MADE OUT TO ORDER AND

         

        BLANK ENDOURSED NOTIFY THE BUYER

         

        INSURANCE POLICY IN DUPLICATE

         

        INSPECTION CERTIFICATE ISSUED BY CIQ

         

        PACKING LIST IN TRIPLICATE

         

        CERTIFICATE OF ORIGIN

         

        The Seller:

        The Buyer:

        Zhejiang YK GG Hand Tool I/E Co., Ltd.

        Sayid Tool Enterprises

        李四

        Mohamed Sayid

          2.進口國開來的有錯誤的信用證

          ISSUING BANK: NATIONAL BANK OF SOUTH AFRICA, DURBAN

          ADVISING BANK: BANK OF CHINA, ZHEJIANG BRANCH

          SEQUENCE OF TOTAL *27: 1/1

          FORM OF DOC. CREDIT *40A: IRREVOCABLE

          DOC. CREDIT NUMBER *20: NBB12-06-287

          DATE OF ISSUE 31C: 120612

          EXPIRY *31D: DATE 120716 PLACE AT DURBAN

          APPLICANT *50: SAYID TOOL ENTERPRISES

          753 TARRAGONA ROAD

          DURBAN SOUTH AFRICA

          BENEFICIARY *59: ZHENJIANG YK GG HAND TOOL I/E CO., LTD.

          269 HUAYANG ROAD

          ZHEJIANG CHINA

          AMOUNT *32B: CURRENCY USD AMOUNT 25700.00

          AVAILABLE WITH/BY *41D: ANY BANK

          BY NEGOTIATION

          DRAFT AT … 42C: AT SIGHT

          FOR FULL INVOICE VALUE

          DRAWEE 42D: NATIONAL BANK OF SOUTH AFRICA

          DURBAN

          PARTIAL SHIPMENT 43P: NOT ALLOWED

          TRANSSHIPMENT 43T: ALLOWED

          PORT OF LOADING 44E: NINGBO / SHANGHAI

          PORT OF DISCHARGE 44F: DURBAN SOUTH AFRICA

          LATEST DATE OF SHIP. 44C: 120716

          DESCRIPTION OF GOODS 45A:

          HAND TOOLS AS PER S/C NO. YKGG120906

          CIFC5 DURBAN

          10PCS COMBINATION SPANNER

          1200SETS, USD11.00PER SET

          12PCS DOUBLE OFFSET RING SPANNER

          1000SETS, USD12.50 PER SET

          PACKING: IN ONE CARTON OF 20 SETS EACH, TOTAL IN

          ONE 20 FEET FULL CONTAINER LOAD.

          DOCUMENTS REQUIRED 46A:

          +SIGNED COMMERCIAL INVOICE IN THREE COPIES

          +FULL SET CLEAN ON BOARD OCEAN BILL OF LADING

          MADE OUT TO ORDER MARKED FREIGHT COLLECT

          NOTIFY APPLICANT

          +PACKING LIST IN THREE COPIES

          +CERTIFICATE OF ORIGIN GSP FORM A IN ONE COPIES

          + INSPECTION CERTIFICATE FOR QUALITY ISSUED BY

          ENTRY-EXIT INSPECTION AND QUARANTINE OF THE

          PEOPLE’S REPUBLIC OF CHINA

          +BENEFICIARY’S CERTIFICATE STATING THAT EACH

          COPY OF INVOICE, BILL OF LADING AND PACKING

          LIST HAVE BEEN SENT TO APPLICANT IMMEDIATELY

          AFTER SHIPMENT

          ADDITIONAL COND. 47A:

          +DOCUMENTS PRESENTED WITH DISCREPANCY

          WHETHER INDICATED OR FOUND IS SUBJECT TO A

          HANDLING FEE OF USD50.00 WHICH IS PAYABLE BY

          THE BENEFICIARY AND WILL BE DEDUCTED FROM

          PROCEEDS UPON NEGOTIATION

          +THIS CREDIT IS SUBJECT TO THE U. C. P. FOR

          DOCUMENTARY CREDITS (2007 REVISION) ICC

          PUBLICATION NO 600

          DETAILS OF CHARGES 71B: ALL BANK CHARGES OUTSIDE SOUTH AFRICA ARE

          FOR ACCOUNT OF THE BENEFICIARY

          PRESENTATION PERIOD 48: WITHIN 5 DAYS AFTER THE DATE OF SHIPMENT BUT

          WITHIN THE VALIDITY OF THE CREDIT

          CONFIRMATION *49: WITHOUT

          INSTRUCTION 78: ON RECEIPT OF DOCUMENTS IN ORDER AT OUR

          COUNTER, WE SHALL REMIT IN ACCORDANCE WITH

          THE NEGOTIATING BANK’S INSTRUCTION IN THE

          SAME CURRENCY OF THE CREDIT

          SEND. TO REC. INFO. 72: DOCUMENTS TO BE DISPATCHED BY COURIER SERVICE

          IN ONE LOT TO NATIONAL BANK OF SOUTH AFRICA,

          TRADE SERVICES, 109 ORANGE STREET DURBAN,

          SOUTH AFRICA

          經審核,信用證中的錯誤有如下十處:

          (1)40A信用證種類錯,應該是:CONFIRMED AND IRREVOCABLE。

          (2)31D信用證到期時間到期地點錯,應該是:DATE 120731 PLACE IN CHINA。

          (3)59受益人名稱地址錯,ZHENJING應該是ZHEJIANG,269應該是296。

          (4)32B信用證金額錯,應該是:USD24415.00。

          (5)45A中的合同號錯,應該是:YKGG120609

          (6)46A中的提單中顯示的“FREIGHT COLLECT”錯,應該是:FREIGHT PREPAID。

          (7)46A中的普惠制產地證GSP FORM A無法提供,因為南非不是給惠國,應該改成C/O。

          (8)46A缺少保險單,CIF術語應由賣方提供保險單。

          (9)48交單期錯,根據合同應該是15天而不是5天。

          (10)49保兌要求錯,不應該是“WITHOUT”,而應該顯示保兌行的名稱及保兌行明確的保兌條款或聲明。

        【國際商務單證員考試審證模擬試題及答案】相關文章:

        國際商務單證員考試審證模擬試題及答案201703-29

        2017國際商務單證員考試《操作與繕制》模擬試題及答案03-27

        2017國際商務單證員考試題及答案03-09

        2017國際商務單證考試模擬試題及答案解析03-08

        2017年國際商務單證員考試精選模擬習題及答案03-05

        國際商務單證員考試及答案03-09

        2017國際商務單證員考試模擬題及答案解析03-29

        2017單證員考試模擬試題及答案03-05

        單證員考試模擬試題及答案201703-30

        国产高潮无套免费视频_久久九九兔免费精品6_99精品热6080YY久久_国产91久久久久久无码

        1. <tt id="5hhch"><source id="5hhch"></source></tt>
          1. <xmp id="5hhch"></xmp>

        2. <xmp id="5hhch"><rt id="5hhch"></rt></xmp>

          <rp id="5hhch"></rp>
              <dfn id="5hhch"></dfn>