1. <tt id="5hhch"><source id="5hhch"></source></tt>
    1. <xmp id="5hhch"></xmp>

  2. <xmp id="5hhch"><rt id="5hhch"></rt></xmp>

    <rp id="5hhch"></rp>
        <dfn id="5hhch"></dfn>

      1. 電氣工程英文簡歷表格

        時間:2024-08-05 04:32:04 英文簡歷表格 我要投稿

        電氣工程英文簡歷表格

          作為求職者想要憑借個人簡歷求職成功就必須要知道自己有什么樣的求職優勢,了解自己的求職優勢才能夠掌握編寫個人簡歷中的側重點。金無足赤人無完人,在個人簡歷的編寫中要學會揚長避短。如果你沒有高等學歷就需要著重編寫專業技能,如果你沒有工作經驗就需要著重編寫學業成就,如果你沒有專業技能就需要著重編寫英語水平。在個人簡歷中要挑選自己擅長的技能編寫,這樣才能夠更大程度上取得用人單位的青睞,從而獲得面試機會。

        電氣工程英文簡歷表格

          有針對性的個人簡歷更容易獲得面試機會,想要通過個人簡歷獲得招聘人員的認可在編寫個人簡歷之前就要知道自己想要在用人單位中獲得一個什么樣的職位。當明確自己的職位過后就可以按照職位所需要的人才來編寫自己的個人簡歷,并且在編寫工作經驗時也需要選擇與職位相關的來編寫。

        Name:yjbys Sex:
        Date of Birth:  Hukou:
        Residency: Work Experience:
        Current Salary: Tel:
        E-mail:www.ruiwen.com/jianli
        Career Objective
        Desired Industry: Electronics/Semiconductor/IC ,Science/Research ,Government ,Others ,Testing, Certification
        Desired Position: Senior Hardware Engineer ,Semiconductor Technology, Branch Office Manager ,Chief Representative ,Research Specialist Staff
        Desired address: Shanghai ,Hongkong ,Beijing ,Taiwan ,Macao Desired Salary: Negotiable
        Work Experience
        2006/06—Present ***Company
          Industry: Electronics/Semiconductor/IC
        Intel Flash Engineering Department Individual Contributor
        Responsibilities:
        I have been working in Intel Flash Assembly & Test Engineering
        Department as an Individual Contributor since June of 2006.
        Being Leader of ATE Yield team, I have been working with the team members to improve the products yield. Our efforts are paid off:
        1. The yield of year 2006 has been dramatically increased than that of year 2005.
        2. The yield of all products, consecutively meets the goal.
        3. The total amount of cost saving due to yield improvement is more than $1 million compared with year 2005. Being the Leader of Board Repair Team in ATE, I worked with my team members, setup a set of new procedure to replace the current one, I defined the schedule, divided the roles & responsibilities among team members, follow up the progress. Finally, the team has made a great cost saving of $2.5M in 2007.
        Report Directly to: Department ManagerNumber of Subordinate: 14
        Reference: Bao Powel
        Achievements: Being Leader of ATE Yield team, I have been working with the team members to improve the products yield.
        Our efforts are paid off:
        1. The yield of year 2006 has been dramatically increased than that of year 2005.
        2. The yield of all products, consecutively meets the goal.
        3. The total amount of cost saving due to yield improvement is more than $1 million compared with year 2005. Being the Leader of Board Repair Team in ATE, I worked with my team members, setup a set of new procedure to replace the current one, I defined the schedule, divided the roles & responsibilities among team members, follow up the progress. Finally, the team has made a great cost saving of $2.5M in 2007.
        2006/01—2006/05 Intel(Shanghai) Technology Development Ltd. Company
          Industry: Electronics/Semiconductor/IC
        Intel STTD-China Department Electronics Development Engineer
        Responsibilities:
        1. I had been working in STTD-China since Jan 2006 to May 2006 as a senior module engineer.
        2. At that time, as a main contributor of this project, we succeeded in developing a set of MASSIVELY PARALLEL CLASS TEST equipment, which is able to test more than 6700 units in one time.
        Report Directly to: Hopman Mark   Number of Subordinate: 14
        Reference: Bao Powel
        Reason for Leaving: I was transferred to Intel(Shanghai)Products Ltd. Company due to the internal re-organization in June of 2006.
        Achievements: As a main contributor of STTD-China department, I co-work with my colleagues to succeed in developing a set of MASSIVELY PARALLEL CLASS TEST equipment, which is able to test more than 6700 units in one cycle.
        2005/05—2006/01 Nanyang University of Science & Technology
          Industry: Electronics/Semiconductor/IC
        Electronics & Electrical Engineering Department Research Fellow
        Responsibilities:
        1. I work in Electronics & Electrical Engineering Department of Nanyang University of Science & Technology as a Research Fellow.
        2. I majored at Gate Oxide Reliability Research in the duration.
        Report Directly to: Professor Pey Kin Leoh 
        Subordinate: 3
        Reference: Patrick Low
        Reason for Leaving: I completed the project which I undertook by myself, and want to do more challenging job.
        Achievements: In less than one year, I made a lot of experiments and acquired the wonderful data for the project by myself.
         Project Experience
        2008/01—Present Assembly NPI (New Product Introduction)
          Project Description: To introduce more products into Intel Flash Assembly factory, I join Assembly NPI team and work as the team leader. I coordinate with IE, Planner, Marketing guy and Engineer to select new product items, do demo in factory, and then qualify it.
        Responsibility: I am working as NPI Team leader and coordinate all team members, define the NPI candidate, make Assembly build plan, follow up the progress.
        2007/01—2007/12 Marginal Electrical Boards Rescue
          Project Description: To rescue some electrical boards of testing equipment, a Task Force team was built up and led by me. We categorized each kind of board, made historical failure analysis on each kind of board and around &2.5 million dollars was saved finally.
        Responsibility: Being the team leader, I took the job of data analysis, define each member's role, make program plan, coordinate each team member and follow up the progress.
        2006/10—2007/05 Optimization the current Test Process Order for Flash Memory
          Project Description: To simplify the current Test procedure and enhance the working efficiency, a Task Force team has been called and started by me.
        Responsibility: Being the Project leader, I take the main responsibility, such as, design, plan, organize and implement.
        2006/05—2006/12 Test Yield of Flash memory Improvement
          Project Description: To improve the test yield of different products, a Task Force team was built up and led by me. Being the team leader, I worked with all team members to dig out the failure root cause for each product, defined action taken plan for each emergency case, coordinated each team member and make pro-active plan to avoided unexpected things happen.
        Responsibility: Being the team leader of Improving Test Yield, coordinate each team member, make program plan and follow up.
         Education and Training
        2005/05—2006/01 Nanyang University of Science & Technology Microelectronics Doctorate
          I worked in Nan yang University of Science & Technology as a Research Fellow. I major at Gate oxide Reliability research in the duration.
        2004/03—2005/03 Seoul National University of Korea Microelectronics Others
          I had been working in National Physical Lab of Seoul National University in Korea since March of 2004 to March of 2005 as a Post-doctor. Where I unhook the project of research & development of Carbon-Nan tube Biosensor. And only after one year, an EIS sensor based on CMOS technology has been successfully produced. And one SCI paper about it has been published in Semiconductor Science and Technology.
        2001/03—2004/03 Shanghai Institute of Microsystems and Information Technology,Chinese Academy of Sciences Information Technology Doctorate
        1998/09—2001/03 Nanjing University of Science & Technology Material Science and Engineering Master
          Being a master student of this period, I have published one EI paper about Super-fine metal power's electrical characteristics.
        1993/09—1997/07 Nanjing University of Science & Technology Material Science and Engineering Bachelor
        1997/07—1998/07 Assistant Engineer in Quality Verification Department, Boiler Factory in Zhengzhou city of Henan resistant Engineer in Quality Verification Department
         Professional Skills
        Language Skills: English: EXCELLENT
        Korean: AVERAGE
        Computer Skills: Technology   skilled 96Month
        SAP   understanding 8Month
        Certificate: 2000/11  MCSE
        1999/06  CET6
         Self-appraisal
        7 years working experience of Semiconductor Industry and where 2 years overseas working/study experience. Smart working, innovation thinking and very talented creative working model.

        【電氣工程英文簡歷表格】相關文章:

        電氣工程專業--英文簡歷表格12-28

        英文簡歷空白表格01-16

        英文簡歷表格形式01-02

        英文簡歷表格范例02-20

        翻譯-英文簡歷表格01-18

        時尚的英文簡歷表格02-20

        助教英文簡歷表格12-30

        共享英文簡歷表格01-18

        碩士英文簡歷表格02-19

        外企英文簡歷表格03-09

        国产高潮无套免费视频_久久九九兔免费精品6_99精品热6080YY久久_国产91久久久久久无码

        1. <tt id="5hhch"><source id="5hhch"></source></tt>
          1. <xmp id="5hhch"></xmp>

        2. <xmp id="5hhch"><rt id="5hhch"></rt></xmp>

          <rp id="5hhch"></rp>
              <dfn id="5hhch"></dfn>