1. <tt id="5hhch"><source id="5hhch"></source></tt>
    1. <xmp id="5hhch"></xmp>

  2. <xmp id="5hhch"><rt id="5hhch"></rt></xmp>

    <rp id="5hhch"></rp>
        <dfn id="5hhch"></dfn>

      1. 分公司經理求職英文簡歷表格

        時間:2024-07-10 15:24:25 英文簡歷表格 我要投稿
        • 相關推薦

        分公司經理求職英文簡歷表格

          用人單位在招聘期間也會收取到大量的個人簡歷,求職者也需要了解在職場中擊敗競爭對手的方式,比如說利用個人簡歷來擊敗對手。那么,求職者又該如何利用個人簡歷擊敗競爭對手呢?

        分公司經理求職英文簡歷表格

          在求職的過程中個人簡歷起到怎樣的作用,在競爭方面又能起到怎樣的作用,這是更好利用個人簡歷的來在競爭中為自己加分,進而才能在有效的擊敗競爭對手。在編寫個人簡歷之前,也要根據個人簡歷的作用,來從中領悟到個人簡歷的競爭力包括有哪些方面,像是個人簡歷整體外在形象、個人簡歷的基本內容,還有個人簡歷中所突出的重點部分等等,這些都是可以作為競爭優勢。

          利用個人簡歷來擊敗競爭對手,簡單來說就是通過個人簡歷來順利的獲得求職面試的機會,從而來提高求職成功率。在這里個人簡歷能夠順力的通過篩選,也就是人通過其高品質的簡歷效果。編寫出高質量的個人簡歷,一來要能夠的明確的指導什么樣的個人簡歷更具有吸引力,二來要學習個人簡歷的寫作技巧,尤其是在語言的使用方面。

        Name:yjbys Sex:
        Date of Birth:  Hukou:
        Residency: Work Experience:
        Current Salary: Tel:
        E-mail:www.ruiwen.com/jianli
        Career Objective
        Desired Industry: Electronics/Semiconductor/IC ,Science/Research ,Government ,Others ,Testing, Certification
        Desired Position: Senior Hardware Engineer ,Semiconductor Technology, Branch Office Manager ,Chief Representative ,Research Specialist Staff
        Desired address: Shanghai ,Hongkong ,Beijing ,Taiwan ,Macao Desired Salary: Negotiable
        Work Experience
        2006/06—Present ***Company
          Industry: Electronics/Semiconductor/IC
        Intel Flash Engineering Department Individual Contributor
        Responsibilities:
        I have been working in Intel Flash Assembly & Test Engineering
        Department as an Individual Contributor since June of 2006.
        Being Leader of ATE Yield team, I have been working with the team members to improve the products yield. Our efforts are paid off:
        1. The yield of year 2006 has been dramatically increased than that of year 2005.
        2. The yield of all products, consecutively meets the goal.
        3. The total amount of cost saving due to yield improvement is more than $1 million compared with year 2005. Being the Leader of Board Repair Team in ATE, I worked with my team members, setup a set of new procedure to replace the current one, I defined the schedule, divided the roles & responsibilities among team members, follow up the progress. Finally, the team has made a great cost saving of $2.5M in 2007.
        Report Directly to: Department ManagerNumber of Subordinate: 14
        Reference: Bao Powel
        Achievements: Being Leader of ATE Yield team, I have been working with the team members to improve the products yield.
        Our efforts are paid off:
        1. The yield of year 2006 has been dramatically increased than that of year 2005.
        2. The yield of all products, consecutively meets the goal.
        3. The total amount of cost saving due to yield improvement is more than $1 million compared with year 2005. Being the Leader of Board Repair Team in ATE, I worked with my team members, setup a set of new procedure to replace the current one, I defined the schedule, divided the roles & responsibilities among team members, follow up the progress. Finally, the team has made a great cost saving of $2.5M in 2007.
        2006/01—2006/05 Intel(Shanghai) Technology Development Ltd. Company
          Industry: Electronics/Semiconductor/IC
        Intel STTD-China Department Electronics Development Engineer
        Responsibilities:
        1. I had been working in STTD-China since Jan 2006 to May 2006 as a senior module engineer.
        2. At that time, as a main contributor of this project, we succeeded in developing a set of MASSIVELY PARALLEL CLASS TEST equipment, which is able to test more than 6700 units in one time.
        Report Directly to: Hopman Mark   Number of Subordinate: 14
        Reference: Bao Powel
        Reason for Leaving: I was transferred to Intel(Shanghai)Products Ltd. Company due to the internal re-organization in June of 2006.
        Achievements: As a main contributor of STTD-China department, I co-work with my colleagues to succeed in developing a set of MASSIVELY PARALLEL CLASS TEST equipment, which is able to test more than 6700 units in one cycle.
        2005/05—2006/01 Nanyang University of Science & Technology
          Industry: Electronics/Semiconductor/IC
        Electronics & Electrical Engineering Department Research Fellow
        Responsibilities:
        1. I work in Electronics & Electrical Engineering Department of Nanyang University of Science & Technology as a Research Fellow.
        2. I majored at Gate Oxide Reliability Research in the duration.
        Report Directly to: Professor Pey Kin Leoh 
        Subordinate: 3
        Reference: Patrick Low
        Reason for Leaving: I completed the project which I undertook by myself, and want to do more challenging job.
        Achievements: In less than one year, I made a lot of experiments and acquired the wonderful data for the project by myself.
         Project Experience
        2008/01—Present Assembly NPI (New Product Introduction)
          Project Description: To introduce more products into Intel Flash Assembly factory, I join Assembly NPI team and work as the team leader. I coordinate with IE, Planner, Marketing guy and Engineer to select new product items, do demo in factory, and then qualify it.
        Responsibility: I am working as NPI Team leader and coordinate all team members, define the NPI candidate, make Assembly build plan, follow up the progress.
        2007/01—2007/12 Marginal Electrical Boards Rescue
          Project Description: To rescue some electrical boards of testing equipment, a Task Force team was built up and led by me. We categorized each kind of board, made historical failure analysis on each kind of board and around &2.5 million dollars was saved finally.
        Responsibility: Being the team leader, I took the job of data analysis, define each member's role, make program plan, coordinate each team member and follow up the progress.
        2006/10—2007/05 Optimization the current Test Process Order for Flash Memory
          Project Description: To simplify the current Test procedure and enhance the working efficiency, a Task Force team has been called and started by me.
        Responsibility: Being the Project leader, I take the main responsibility, such as, design, plan, organize and implement.
        2006/05—2006/12 Test Yield of Flash memory Improvement
          Project Description: To improve the test yield of different products, a Task Force team was built up and led by me. Being the team leader, I worked with all team members to dig out the failure root cause for each product, defined action taken plan for each emergency case, coordinated each team member and make pro-active plan to avoided unexpected things happen.
        Responsibility: Being the team leader of Improving Test Yield, coordinate each team member, make program plan and follow up.
         Education and Training
        2005/05—2006/01 Nanyang University of Science & Technology Microelectronics Doctorate
          I worked in Nan yang University of Science & Technology as a Research Fellow. I major at Gate oxide Reliability research in the duration.
        2004/03—2005/03 Seoul National University of Korea Microelectronics Others
          I had been working in National Physical Lab of Seoul National University in Korea since March of 2004 to March of 2005 as a Post-doctor. Where I unhook the project of research & development of Carbon-Nan tube Biosensor. And only after one year, an EIS sensor based on CMOS technology has been successfully produced. And one SCI paper about it has been published in Semiconductor Science and Technology.
        2001/03—2004/03 Shanghai Institute of Microsystems and Information Technology,Chinese Academy of Sciences Information Technology Doctorate
        1998/09—2001/03 Nanjing University of Science & Technology Material Science and Engineering Master
          Being a master student of this period, I have published one EI paper about Super-fine metal power's electrical characteristics.
        1993/09—1997/07 Nanjing University of Science & Technology Material Science and Engineering Bachelor
        1997/07—1998/07 Assistant Engineer in Quality Verification Department, Boiler Factory in Zhengzhou city of Henan resistant Engineer in Quality Verification Department
         Professional Skills
        Language Skills: English: EXCELLENT
        Korean: AVERAGE
        Computer Skills: Technology   skilled 96Month
        SAP   understanding 8Month
        Certificate: 2000/11  MCSE
        1999/06  CET6
         Self-appraisal
        7 years working experience of Semiconductor Industry and where 2 years overseas working/study experience. Smart working, innovation thinking and very talented creative working model.

        【分公司經理求職英文簡歷表格】相關文章:

        銷售經理求職英文簡歷表格02-12

        開發經理求職英文簡歷表格03-08

        投資經理英文簡歷表格02-21

        大堂經理英文簡歷表格01-09

        采購求職英文簡歷表格01-18

        出口采購經理英文簡歷表格12-30

        區域經理英文簡歷表格12-21

        人力資源經理英文簡歷表格01-06

        銷售經理應聘英文簡歷表格02-21

        銷售行政經理英文簡歷表格12-29

        国产高潮无套免费视频_久久九九兔免费精品6_99精品热6080YY久久_国产91久久久久久无码

        1. <tt id="5hhch"><source id="5hhch"></source></tt>
          1. <xmp id="5hhch"></xmp>

        2. <xmp id="5hhch"><rt id="5hhch"></rt></xmp>

          <rp id="5hhch"></rp>
              <dfn id="5hhch"></dfn>